Site Environment Requirements & Checklist
Item | Spec | Requirements & Checklist | Confirmation |
|---|---|---|---|
Power Supply |
4*6AWG | Receptacle requirements
| X to Y: ______volts (208-240v) X to N: _____volts (100-125v) Y to N: _____volts (100-125v) X to Ground: _____volts (100-125v) Y to Ground: _____volts (100-125v) Installed & Tested:
|
Network |
OR
|
| Installed & Tested:
|
Water |
| Water Supply Requirements
Water Quality Requirements
| Installed & Tested:
|
Drainage |
|
| Installed & Tested:
|
Space |
| Installation Space
Environmental Conditions
| Confirmed:
|
Consumables |
|
| Prepared:
|