Site Environment Requirements & Checklist
Item | Spec | Requirements & Checklist | Confirmation |
|---|---|---|---|
Power supply for
|
L6-30R | Receptacle requirements
| X to Y: ______volts (208-240v) X to Ground: _____volts (100-125v) Y to Ground: _____volts (100-125v) Installed & Tested:
|
Power supply for
|
5-15R | Receptacle requirements
| X to Y: ______volts (100-125v) X to Ground: ______volts (100-125v) Y to Ground: ______volts (0v) Installed & Tested:
|
Network |
|
| Installed & Tested:
|
Water |
| Water Supply Requirements
Water Quality Requirements
| Installed & Tested:
|
Drain |
|
| Installed & Tested:
|
Space |
|
| Installed & Tested:
|
Consumables |
|
*It depends on the dispensing units connected | Installed & Tested:
|
Installation Site Information
Business Name | Contact Name | ||
|---|---|---|---|
Street Address | Contact Phone | ||
City/State/Zip | Contact Email | ||
Requested Install Date |
*This pre-environment checklist must be completed before any installation is scheduled.
Please email completed form to install@kiocafe.com
Print Name _________________________ Signature ________________________ Date ___________________________





.png?sv=2022-11-02&spr=https&st=2025-12-09T03%3A23%3A16Z&se=2025-12-09T03%3A34%3A16Z&sr=c&sp=r&sig=5w7YRrxgw61Be3ioH1fh1PvhNZHWySZEGNv3OU9o7%2Bc%3D)
