Preparation before Setup

Prev Next
  1. Upon receiving the machine, please inspect the packaging carefully. If it is damaged, kindly contact our company for assistance after consulting with the logistics provider.

  2. Before proceeding, remove all packaging materials, including wooden cases, cartons, adhesive tape, foam, and protective film.

  1. Ensure that the ground where the machine operates is firm and smooth.

    1. Keep the machine away from heat sources and direct sunlight to maintain optimal performance.

    2. Position the machine in an area with good ventilation, ensuring there is at least 20cm of space around the machine.

    3. Avoid placing the machine in damp or splash-prone areas. Clean any water stains and dirt with a soft cloth to prevent rust or deterioration of the electrical insulation performance.

    4. Avoid placing the machine in excessively cold environments, and refrain from using it outdoors or in rainy condition.

  1. Machine Stabilization Period:

After installation, wait for at least 30 minutes before connecting the power supply to ensure proper operation. If refrigeration is required, allow the machine to stand still for 4-5 hours beforehand to prevent compressor damage.

 

  1. Use the wrench provided in the kit bag to adjust the feet's height and level the machine.