| Plan for the usage Plan the products to be loaded in advance and draft the slot type, height, and power connection, if necessary. |
|
| Connect to Power The power plug must be connected to a reliable, solid, and grounded power supply. |
|
| Load Products Load the products following the loading instructions. |
|
| Program the Machine Configure the product info, prices, inventories, temperature, and other settings in the management system. |
|
| Load Change Money Add change: coins and banknotes (if applicable). |
General Setup Process
- Published on May 29, 2026
- 1 minute(s) read
Was this article helpful?



.png?sv=2026-02-06&spr=https&st=2026-06-01T00%3A56%3A37Z&se=2026-06-01T01%3A07%3A37Z&sr=c&sp=r&sig=mBfUj06KA7rUNlUqLTBZsfbSfWbmxNmFS5ZZ67hHXqs%3D)

.png?sv=2026-02-06&spr=https&st=2026-06-01T00%3A56%3A37Z&se=2026-06-01T01%3A07%3A37Z&sr=c&sp=r&sig=mBfUj06KA7rUNlUqLTBZsfbSfWbmxNmFS5ZZ67hHXqs%3D)

.png?sv=2026-02-06&spr=https&st=2026-06-01T00%3A56%3A37Z&se=2026-06-01T01%3A07%3A37Z&sr=c&sp=r&sig=mBfUj06KA7rUNlUqLTBZsfbSfWbmxNmFS5ZZ67hHXqs%3D)

.png?sv=2026-02-06&spr=https&st=2026-06-01T00%3A56%3A37Z&se=2026-06-01T01%3A07%3A37Z&sr=c&sp=r&sig=mBfUj06KA7rUNlUqLTBZsfbSfWbmxNmFS5ZZ67hHXqs%3D)