We would like to inform you that we have scheduled server maintenance for the PayRange Central server product on November 3rd from 2:30 AM EST to 7:30 AM EST. 

We have completed the security upgrade to PHP 7.4 on PayRange Central, fully resolving CISA’s advisory.

General Setup Process

Prev Next

Plan for the usage

Plan the products to be loaded in advance and draft the slot type, height, and the power connection combination if necessary.

Connect to Power

The power plug must be connected to a reliable, solid, and grounded power supply.

Load Products

Load the products following the loading instructions.

Program the Machine

Configure the product info, prices, inventories, temperature, and other settings in the management system.

Load Change Money

Add change: coins and banknotes (if applicable).