| Plan for the usage Plan the products to be loaded in advance and draft the slot type, height, oConnect to power combination if necessary. |
|
| Connect to Power The power plug must be connected to a reliable, solid and grounded power supply. |
|
| Load Products Load the products following the loading instructions. |
|
| Program the Machine Configure the product info, prices, inventories, temperature, and other settings in the management system. |
|
| Load Change Money Add change: coins and banknotes (if applicable). |
General Setup Process
New
- Published on Mar 4, 2026
- 1 minute(s) read
Was this article helpful?



.png?sv=2022-11-02&spr=https&st=2026-03-22T00%3A34%3A29Z&se=2026-03-22T00%3A45%3A29Z&sr=c&sp=r&sig=kFKFar0qvtuxePG8n%2BmBNbEW1WawdfuZ46hCDCx7ois%3D)

.png?sv=2022-11-02&spr=https&st=2026-03-22T00%3A34%3A29Z&se=2026-03-22T00%3A45%3A29Z&sr=c&sp=r&sig=kFKFar0qvtuxePG8n%2BmBNbEW1WawdfuZ46hCDCx7ois%3D)

.png?sv=2022-11-02&spr=https&st=2026-03-22T00%3A34%3A29Z&se=2026-03-22T00%3A45%3A29Z&sr=c&sp=r&sig=kFKFar0qvtuxePG8n%2BmBNbEW1WawdfuZ46hCDCx7ois%3D)

.png?sv=2022-11-02&spr=https&st=2026-03-22T00%3A34%3A29Z&se=2026-03-22T00%3A45%3A29Z&sr=c&sp=r&sig=kFKFar0qvtuxePG8n%2BmBNbEW1WawdfuZ46hCDCx7ois%3D)