|
| Plan for the usage Plan the products to be loaded in advance and draft the slot type, height, oConnect to power combination if necessary. |
|
| Connect to Power The power plug must be connected to a reliable, solid and grounded power supply. |
|
| Load Products Load the products following the loading instructions. |
|
| Program the Machine Configure the product info, prices, inventories, temperature, and other settings in the management system. |
|
| Load Change Money Add change: coins and banknotes (if applicable). |
General Setup Process
New
- Published on Mar 4, 2026
- 1 minute(s) read
Was this article helpful?



.png?sv=2026-02-06&spr=https&st=2026-11-18T20%3A31%3A50Z&se=2026-11-18T20%3A42%3A50Z&sr=b&sp=r&sig=HpNbVjpnAh87fQS0BcULrhjqrA0CYjBOWaR7Lp5Eo70%3D)

.png?sv=2026-02-06&spr=https&st=2026-11-18T20%3A31%3A50Z&se=2026-11-18T20%3A42%3A50Z&sr=b&sp=r&sig=nVKB%2BXmaePWoxTLTvAi9A9bQ8HSPzggr8b07JXRHZX4%3D)

.png?sv=2026-02-06&spr=https&st=2026-11-18T20%3A31%3A50Z&se=2026-11-18T20%3A42%3A50Z&sr=b&sp=r&sig=LUi2ZVm1pvtE6XGSnhX9UMlqN8XloR4yO5RzEcxQBXA%3D)

.png?sv=2026-02-06&spr=https&st=2026-11-18T20%3A31%3A50Z&se=2026-11-18T20%3A42%3A50Z&sr=b&sp=r&sig=3QV%2FiVqxCXVxR4dLEpCnvNCt6p0Vys5yQj%2Fd2fjYyEQ%3D)