Overall Schedule
NO. | Maintenance Item | Daily | Monthly | Or as required |
|---|---|---|---|---|
1 | Raw material bucket | - | Once at least | - |
2 | Water receptacle | ✔ | - | - |
3 | Raw material mixer | ✔ | - | - |
4 | The outlet | ✔ | - | - |
5 | Cover of the vent | - | - | ✔ |
6 | Fan | - | - | ✔ |
7 | Connecting pipe | - | - | ✔ |
Maintenance Plan
Items | Description | Views |
|---|---|---|
Raw material bucket | -Soak the raw material bucket into water and clean it with soft dishcloth. -Dry it and put it back to the original place. -Clean the bucket at least once a month. |
|
Water receptacle | -Pour out the accumulated water within the receptacle in time and clean it. -Dry it and put it back to the original place. -Clean it every day. |
|
Raw material mixer | -Soak the raw material mixer into water and clean it with soft dishcloth. -Dry it and put it back to the original place. -Clean it every day. |
|
Outlet | -Clean the place around the outlet with wet dishcloth. -Remove the humidity with dried dishcloth. -Clean it every day. |
|
Cover of the vent | -Soak it in the water after uninstallation to remove the dust and powder of raw material.
|
|
Fan | -Clean it with bush to remove the dust and powder. -Dry it and install it again. |
|
Connecting pipe | -Press the cleaning button in the left side of the inner part. After cleaning the connecting pipe, water will fall into the water receptacle automatically.
-Pour out water from the water receptacle, and put the receptacle back to its original place.
|
|








