Documentation Index

Fetch the complete documentation index at: https://support.kiosoft.com/llms.txt

Use this file to discover all available pages before exploring further.

1. Adjust Tray Height

Prev Next

1) Move out the tray

1) Lift up the front of the tray a little bit.

2) Hold up the front end of the tray, then pull out the tray.

3) Cut the ribbon fastening the cable at the back side of the tray.

Hands lifting the front of a vending machine tray; view shows operator's hands at the tray front and red arrows indicating lifting motion.

Hands holding and pulling out a black vending tray; image shows tray partially pulled out with coils visible.

Inside-back view of tray area showing ribbon cable and fans; close-up of cable fastened to tray back side.

4) Unplug the tray cable connector.

5) Take out the tray.

Close-up of a hand unplugging a multi-pin tray cable connector inside the vending machine.

Empty black vending tray removed and placed on a table; shows underside and coil compartments of the tray.

2) Adjust the height of the slide rails

1) Remove the screws of the tray slide rail at both sides.

2) Un hook the slide rails from the holding holes.

Note: The distance between two contiguous holding holes is 2cm.

Left interior of vending machine showing slide rail screw location; red box highlighting the screw to remove.

Hand unhooking a metal slide rail from holding holes inside vending machine; view shows rail being lifted out.

Close-up of vertical row of holding holes on cabinet with red annotation showing 2 cm spacing between holes.

3) Adjust the slide rails to the proper height and fasten with screws.

4) Install back the tray.

Note: The height of the slide rails at the two sides should be the same.

3)    Program the Tray Height and Elevator

Login the Android management system with admin account. Go to “Debug” -- “Move” section by the main menu at the top side. In this section you can test the movement of the elevator, adjust the elevator height to each layer, test if the layer height is collaborated with the movement of the elevator, etc.

Layer height setting

Layer height adjustment and testing

  • Select the layer to be queried;

  • Elevator move to this layer to check if it’s the proper position;

  • Adjust the height by input the layer number and height;

  • Check the elevator position again;

Screenshot of the Android management system “Move” screen — light-blue framed mobile app UI showing sections titled “Move”, input fields labeled “Number of layers” and “Floor height”, action buttons labeled “Query”, “Set up”, and “Yes”, and large rounded buttons near the bottom labeled “Elevator start point” and “Move to side door”. The screenshot is shown within a red inner border and blue outer frame.