This document introduces the “Preventive Maintenance” plans for each module of Series 3.5E.
Preventative Maintenance Checklist
# | Modules | Maintenance Content | Frequency |
1.1 | Cameo | 12 months | |
1.2 | Cameo | Brew, milk, grinder, hydraulic as page 9 at Cameo PM Kits Manual | 24 months |
2 | Powder Dispenser | Material bucket cleaning, mixer cleaning, as Powder Dispenser Deep Cleaning Guideline Video | 1 month |
3.1 | RCC Ice Maker | Sanitization flush as video guide at the inside line: sanitization flush | 6 months |
3.2 | RCC Ice Maker | Remove dust from inside parts, as RCC Ice Maker Inside Dust Removal Guide | 12 months |
4.1 | Blusoda | Sanitization flushing, as page 35 of the Blusoda User Manual. | No use over 2 weeks |
4.2 | Blusoda | Remove dust from internal parts, as page 34 of the Blusoda User Manual. | 6 months |
5.1 | Z-Arm | Guide rail grease replacement, as page 1-4 of Z-Arm Maintenance Manual | 6 months |
5.2 | Z-Arm | 12 months | |
5.3 | Z-Arm | 24 months |